Quality and compliance

Cheap lifting equipment tends to fail in the same places: chain links, hooks, brake and housing. Our job is to catch that before the container is loaded.

What we check

  • Incoming material — metallurgical analysis of steel before it enters production
  • Chain and components — proof-load and break-load testing on chain, hooks and shackles
  • Surface and environment — salt-spray and high/low temperature testing on plated and painted parts
  • Assembly and function — brake, gearing and overload behaviour on every unit
  • Final inspection — 100% check before packing, with photos and video

Certificates and cover

CE and GS certification, PICC product liability insurance, and a national industrial production licence held by the manufacturing base. Certificates travel with the shipment; test reports are available on request.

What you receive

  • Pre-shipment inspection report for each batch
  • Photos and short videos of the actual goods and packing
  • Container loading record with seal number
  • Full export documentation set
滚动至顶部